Home/Technical Information/Technical Notes

Technical Notes

Metalens Unit Cell Design: Building and Validating an RCWA Phase Library

How to build the phase and transmission library a metalens draws on, and how to judge whether it is good enough: period and height, RCWA settings and convergence, normalization, FDTD validation, entry selection and the limits of the local periodic approximation.